The proper installation of the steam trap has a direct impact on the normal operation of the trap and the production efficiency of the equipment. The use of the trap is 20% due to the quality of the installation. As a pressure pipe component, Hangzhou Watt Energy Saving Engineering Co., Ltd. believes that it is necessary for qualified installers to install steam traps in strict accordance with the formal installation requirements, so that the steam traps and equipment can achieve the best working efficiency.
Before installation, the trap needs to carefully check the model, caliber, differential pressure, temperature, pressure, connection level and standard, and establish the data statistics of the combination of the on-site tag and the trap position to facilitate the management and maintenance of the trap operation.
Watt traps must be subjected to pressure testing and leak testing before leaving the factory, if functional testing is available. A one-to-one test report or certificate of conformity provided by the manufacturer is provided.
For traps with special requirements, such as required material certificate, welding inspection certificate, gasket material certificate, casting furnace batch number, etc., can be installed before checking before installation.
1. When testing the steam pipeline, the steam trap should be removed and replaced with a short pipe. At least the trap valve should be closed before and after the trap. Always purge the pipe with pressurized steam before using the trap to remove debris from the pipe.
2. A filter should be installed in front of the trap to ensure that the trap is not blocked by the pipeline and clean the filter regularly. Even if the trap has its own filter, it is recommended to add an external filter. The filter adopts a pore size of 0.5-1mm. The pressure drop is too small and too thick to function.
3. The trap should be installed at the low position of the equipment outlet, and the condensate should be discharged in time to avoid the steam resistance of the pipeline. However, the down tube is provided with a dirt collection section to prevent impurities from directly entering the trap.
4. The condensate flow direction should be consistent with the trap installation arrow mark. For the mechanical trap installation, install the manufacturer's mounting orientation.
5. Install the valve before and after the trap to facilitate the repair of the trap at any time.
6. If there is no position to install the trap at the lower position of the zui of the equipment, add a backwater bend (condensation water lifting joint) at the low position of the water outlet, and raise the condensed water level before installing the steam trap to avoid steam resistance.
7. The outlet pipe of the trap should not be immersed in water. (If immersed in water, drill a hole in the bend to break the vacuum and prevent the sand from sucking back.)
8. For traps that may generate a steam lock, install a balance tube on top of the trap.
9. Steam traps should not be installed in series. For steam traps with poor emptying capacity, a thermostatic venting valve can be connected in parallel.
10. Each device should be fitted with a trap. Cannot cluster hydrophobic.
11. Before the thermostatic trap, it is necessary to have a subcooling pipe that is not insulated for at least one meter according to the degree of subcooling. Other forms of traps should be as close as possible to the equipment.
12. When the drum type drying (with siphon type) equipment uses the steam trap, please specify: use the steam trap with anti-steam resistance device to avoid the steam lock of the equipment.
13. If there is condensate recovery after the trap, the trap outlet pipe should be connected to the manifold from the top of the recovery manifold to reduce back pressure and prevent backflow.
14. If there is condensed water recovery after the trap, the pipelines with different pressure levels should be recycled separately.
15. After the trap, the condensate recovery manifold cannot climb the slope, which will increase the back pressure of the trap.
16. Install a check valve before the condensate from the trap enters the recovery manifold to prevent condensate from flowing back. The check valve behind the thermodynamic steam trap should be kept at an interval of about 1 m to avoid damage.
17. Install a steam trap on the steam pipe. The main pipe should be provided with a condensate collecting well close to the radius of the main pipe, and then piped to the steam trap at a slightly higher side. The tubules must be kept warm and as short as possible.
18, mechanical traps are not used for a long time, you must remove the drain screw to drain the water inside to prevent freezing.
19. For the application of back pressure recovery of condensed water, in order to prevent corrosion and water accumulation, a bimetallic trap is added at the bottom of the hydrophobic pipe and directly emptied to facilitate the condensate draining during start-up and shutdown.
20, found that the steam trap running steam, it is necessary to timely discharge and clean the filter, according to the actual use of the situation to check, in case of failure to repair at any time. At least one inspection per year is required to remove impurities.
21. For welded steam traps, when the pipe is welded, the inner parts are removed and welded.
22. For occasions with large load changes, two different displacement traps can be installed up and down in parallel, and the small load trap should be installed in the lower part.
23, disc traps installed in outdoor or rainy environments, need to increase the heat shield.
24, mechanical traps are very sensitive to the large differential pressure of zui, in the installation must be balanced with the large working pressure difference of the Zui and the design pressure difference on the valve nameplate.
25, the installation of the trap with a diameter larger than DN40 must be supported. Do not force the trap.
26, the diameter of the pipe before and after the installation of the trap is likely to be different, the front end is condensed water, the rear end is mostly selected by the secondary steam, and the diameter of the condensate water pipe is changed by the heterocentric.
27. For traps with large caliber and heavy weight, it is necessary to pay attention to the manufacturer's recommended center of gravity and stress during installation and transportation.
28, the trap needs to be insulated, especially mechanical traps. It is recommended to use the matching insulation jacket to facilitate the inspection and maintenance of the valve.
29, the installation of the trap must consider the maintenance and inspection space, for important traps to install high-temperature tube mirror in front of the trap, the glass surface of the tube mirror should be easy to observe and distinguish the flow of steam.
30. If the pipe is connected to the main pipe after the steam trap, it must be mitered to avoid water hammer and main pipe erosion.
The experience of Hangzhou Watt Energy Saving Engineering Co., Ltd. for nearly 20 years shows that the trap is considered as a small part in the whole steam system, but it has a great influence on the system operation and economic operation, so the maintenance and overhaul of the trap is also crucial. Only the importance of the trap in production is fully valued. Diligent maintenance, so that the trap is often in a good working condition, in order to ensure that the energy saving effect and economic benefits are achieved. Sometimes the energy waste caused by just a trap leak is considerable.
Portable Vet Ultrasound Series
Wireless Ultrasound for animal
XProbe-C Convex, suit for big placenta of cattle and horse
XProbe-L Linear, suit for small placenta of cattle and horse
XProbe-N Suit for sheep
Feature:
· High cost-effective
·Wireless connectivity, easy to operate
·Small and light,easy to carry
Specifications:
-Scanning mode: Electronic array
-Image mode: B, B/M
-Frequency: Convex 3.5MHz/5MHz, Linear 7.5MHz/10MHz
-Scan Depth: Convex 90/130/160/200mm, Linear 20/40/60/100mm
-Probe Radius/Length: Convex R60, Linear L64
-Image Adjust: Gain, DYN, Focus, Depth, Harmonic, Denoise
-Puncture assist function: the function of in-plane puncture guide line, out-of-plane puncture guide line, automatic blood vessel measurement, and the enhancement function of needle point development.
-Cineplay: auto and manual, frames can set as 100/200/500/1000
-Measure: Length, Area, Angle, Obstetrics
-Image frame rate: 18 frames/second
-Image save format: jpg, avi and DICOM
-Battery working time: 6-8 hours
-Charge: by USB
-Length: 800mm
-Weight: 600g
-Wifi type: 802.11g/20MHz/5G/450Mbps
-Working system: Android
Portable Vet Ultrasound,Vet Untrasound Probe,Veterinary Ultrasound Machine Portable,Animal Ultrasounder Scanner
Guangzhou Sonostar Technologies Co., Limited , https://www.sonoeye.com